Heavy Duty Ramp with Electric Pully.
A heavy duty ramp was built to allow for an electric pulley to be attached so that a 400kg marble worktop could manuvered up and into the too floor.
A heavy duty ramp was built to allow for an electric pulley to be attached so that a 400kg marble worktop could manuvered up and into the too floor.
Scaffold to front elevation to allow for the lead to be changed along the building and the roof to be replaced. Internal ladders used to provide better access to the top lift.
A scaffold needed to bridge an old conservatory and allow for re pointing and work on the chimney stack.
Scaffold to bridge two towers over a conservatory to allow for engineers to fix solar panels.
A scaffold to accommodate the changing of windows and some degraded bricks. A full wrap around to the chimney stack to allow for it to be repointed.
A scaffold to one elevation to allow for a flu to added into the dormer roof.
A progressive extension with internal and external scaffold. We were on this job for over 2 months to help the bricklayers and then a final lift was added for a new roof.