Scaffold for rendering purposes with debris netting.
Scaffold to 3 elevations to tg:20. Netting added onto the pearling to keep any debris from the public while work was carried out. All scaffold was for rendering purposes.
Double handrail edge protection onto a parapet roof.
Double hand rail edge protection onto parafit roof at lemington hall.
Full wrap-around on busy high street.
Scaffold to four elevations to tg 20 standards. It was to accomdate a new roof, new windows and to be painted.
Independent scaffold on busy high street.
Scaffold to one elevation to tg 20 standards on a busy public highway to allow for roof work.
Splayed scaffold with kentledge.
A splayed scaffold with kentledge to allow for awning repairs and the brickwork to be cleaned. Hoarding was also added at a later stage so this was all done to design.
Tower with internal ladders and boarded on every lift.
This needed a site specific risk assessment for confined spaces. The scaffold was a 5 foot tower with every lift boarded and internal ladders up the riser to allow for the air conditioning to be added. We were then added to the safe contractor list at the gate in Newcastle upon Tyne afterwards.