Heavy Duty Ramp with Electric Pully.
A heavy duty ramp was built to allow for an electric pulley to be attached so that a 400kg marble worktop could manuvered up and into the too floor.
Scaffold for rendering purposes with debris netting.
Scaffold to 3 elevations to tg:20. Netting added onto the pearling to keep any debris from the public while work was carried out. All scaffold was for rendering purposes.
Double handrail edge protection onto a parapet roof.
Double hand rail edge protection onto parafit roof at lemington hall.
Two boarded lifts on the front elevation.
Scaffold to front elevation to allow for the lead to be changed along the building and the roof to be replaced. Internal ladders used to provide better access to the top lift.
Full wrap-around on busy high street.
Scaffold to four elevations to tg 20 standards. It was to accomdate a new roof, new windows and to be painted.
Chimney stack and beam work.
A scaffold needed to bridge an old conservatory and allow for re pointing and work on the chimney stack.
Bridging towers over conservatory.
Scaffold to bridge two towers over a conservatory to allow for engineers to fix solar panels.