Heavy Duty Ramp with Electric Pully.
A heavy duty ramp was built to allow for an electric pulley to be attached so that a 400kg marble worktop could manuvered up and into the too floor.
A heavy duty ramp was built to allow for an electric pulley to be attached so that a 400kg marble worktop could manuvered up and into the too floor.
Scaffold to 3 elevations to tg:20. Netting added onto the pearling to keep any debris from the public while work was carried out. All scaffold was for rendering purposes.
Double hand rail edge protection onto parafit roof at lemington hall.
Scaffold to front elevation to allow for the lead to be changed along the building and the roof to be replaced. Internal ladders used to provide better access to the top lift.
Scaffold to four elevations to tg 20 standards. It was to accomdate a new roof, new windows and to be painted.
A scaffold needed to bridge an old conservatory and allow for re pointing and work on the chimney stack.
Scaffold to bridge two towers over a conservatory to allow for engineers to fix solar panels.
Scaffold to one elevation to tg 20 standards on a busy public highway to allow for roof work.
A splayed scaffold with kentledge to allow for awning repairs and the brickwork to be cleaned. Hoarding was also added at a later stage so this was all done to design.
A scaffold to accommodate the changing of windows and some degraded bricks. A full wrap around to the chimney stack to allow for it to be repointed.